Green transition

The Arcadis Ost 1 project will have a capacity of 247 MW and be able to deliver green power to approximately 300.000 German households. The Arcadis Ost 1 project is scheduled to be fully commissioned in 2023.

Services provided by ISC

ISC has delivered the full detailed design for the topside structure of the substation. The substation is able to deliver 247 MW of low-cost produced power to shore. The weigh of the topside is 2200 tons. ISC has been in charge of the full range of engineering disciplines for the substation.

General description of the project

The offshore windfarm is located in the German Baltic Sea around 19 km from the island of Rugen. The offshore project is expected to start delivering power in 2023. The topside will be supported by a jacket located on a water depth of 43.7 meters. ISC is a sub-contractor to Bladt Industries and will deliver the engineering disciplines for the substation.

Contact
Andreas Laungaard

Andreas Laungaard

Vice President Offshore
Torben Løkkegaard

Torben Løkkegaard

Head of Offshore Substructures & Geotechnics
Peter Seielstad Nielsen

Peter Seielstad Nielsen

Business Development