Detailed design of the primary and secondary structures

The design includes foundation design including monopile, J-Tube cage, transition piece and topside cable deck, scour design, drivability analysis, temporary installation guides and supports, run-up protection, sea fastening design.

Located on a water depth of 33 meters, the substructure including topside cable deck supports the topside with a weight of 1100 tons. The substructure accommodates 7 j-tubes for array cables, 2 j-tubes for export cables and 1 j-tube for inter-platform coupling cable.