The top is located in the German part of the North Sea on a traditional four-legged jacket of 30 m of water about 40 km from the German coast. The transformer platform is 332 MW.
The top side weighs 1950 tons and the jacket has a weight of 1750 tons. Topside is a completely classic design with two transformers and a helideck.
The wind farm is 42 km2 and will consist of 54 wind turbines of 6 MW each. The transformer platform is scheduled for installation in 2014.