The Kaskasi ӏӏ offshore windfarm will count 32 wind turbines in total and be able to generate energy to around 400.000 German households. The project is expected to finish in 2021.

Services provided by ISC

ISC has been in charge of the full detailed design of the substation. The weight of the topside is 2350 tons and the topside is supported by a jacket.

General description of the project

The Kaskasi offshore windfarm is expected to finish and installed in 2021. The project is located in the German Bight. The water depth is 38.3 meters. The owner of the project is Innogy and ISC was hired as a sub-contractor to Bladt Industries.