The drilling rigs were delivered from shipyards in the Far East and transported to Norway for start-up for the installation of company equipment.

Consultant Role:

  • Design review and optimization of decoration design at yard, saving more than 100mT steel for a rig.
  • Design of mounting of steel and hull reinforcement to support Company equipment.
  • Site survey during fabrication at shipyard
  • Monitoring of the site during start-up in Norway
  • Certification packages for changes during start-up for DNV-GL verification.