The substation has a capacity of 216 MW and weighs 1200 tonnes. The water depth is app. 20 m and the foundation is a monopile jacket.

The substation is expected to be installed in 2013.  The 14 km2 windfarm comprises 72 windturbines of each 3 MW is placed 37 km from shore. It is expected to be taken into service during 2014.

It is owned by Northwind Offshore Energy and the topside is being built by Bladt Industries A/S.