Our advisers possess specialized skills and extensive experience, which is why they can handle various types of projects within the oil and gas sector.
Detailed design of jackets and piles for the redeveloped Tyra II.
Tyra Southeast B platform installed next to the Southeast A platform.
The Dan Bravo platform rationalization concept is to deman the Dan Bravo Complex (achieve unmanned platform status).
The Halfdan field in the Danish North Sea sector has been expanded.
Maersk Drilling XLE rigs are a series of four ultra harsh environment jackup drilling rigs.
The ME field in Norway was rebuilt in 2008-2010 by Talisman. A storage tank was placed on the seabed 95m below sea level.