Detailed design of primary and secondary structures

The design includes foundation design including monopile, j-tube cage, transition piece, topside cable deck, scour design, drivability analysis, temporary installation guides and supports, run-up protection, and sea fastening design. The substructure accommodates seven j-tubes for array cables, two j-tubes for export cables, and one j-tube for inter-platform coupling cables.

The monopile is 5.6-7.8 meters in diameter.

309 MW green energy 

Rentel is located 40 km from Oostende on the Belgium coast and is on a water depth of 31 meters. The wind farm consists of 42 wind turbines. The substructure, including the topside cable deck, supports the topside with a weight of 1100 tons.